Friday, December 16, 2011

Week #3 TCOB: Final Design Sketch

Large Group: Overview (5-10 min)
·         Constraints (Revisited) FAHY
·         Funding / Materials Update SASSANO / PORTER
·         Today’s Requirements (FAHY)
·         Final Design Sketch (PATTERSON)

Small Groups: (60 min)

·         Show 4 Possible Design Sheet with simple machines to teacher. (Students who do not have 4 Possible Design Sheet checked by 10:10 will receive a zero for the sheet and report to Mr. Patterson and Mr. Fahy.)

·         Students who have finished 4 Possible Design Sheet will receive the Final Design Sheet. Students are construct a high quality diagram and detailed list of materials, including a price list.

·         STUDENTS MUST HAVE FINAL DESIGN SHEET AND MATERIALS LIST APPROVED BY MR. PATTERSON BEFORE YOU LEAVE FOR CHRISTMAS BREAK.

·         A- HUNT A5
·         B- SASSANO A6
·         C- MICHAUD A7
·         D-OAKLEY A8


FINAL PROJECT IDEA DUE THURSDAY 12/22

Thursday, December 8, 2011

Week #2 TCOB: Adapting to Mystery Constraint

9:30 Large Group:
·         Mystery Constraints Revealed (FAHY .ppt)
·         Examples of Adaptation (FAHY/PATTERSON)
·         Explain Rotations and Binder Requirements

9:45 Small Group Rotations: Brainpop and Quiz (8 Minutes Each)
·         A- HUNT -Lever A5 (to A6)
·         B- SASSANO -Inclined Plane A6 (to A7)
·         C- MICHAUD -Wheel and Axle A7 (to A8)
·         D-OAKLEY –Pulley A8 (to A5)
·         End Rotation in Original Groups

10:15 Original Small Group:
·         Adapt existing designs to new constraints
·         Handout Final Design Sheets
·         Finalize Final Project Idea

10:39 4th Period

Thursday, December 1, 2011

Week #1 TCOB Kickoff

9:30 Large Group:
9 :45 Small Groups: (Science Lab Groups)

Group A: A-5 Hunt
Group B: A-6 Sassano
Group C: A-7 Michaud
Group D: A-8 Oakley / Porter

Research Sites: Write down solution ideas, notes, sketches etc. on Research / Brainstorm Page
Decide on 4 Possible Solutions on Possible Solution Page

10:30 Large Group: Reveal Mystery Constraint